Customized Aluminium Alloy Tool Box/Fight Case with ISO9001 Certificated
Parts could be changed |  | |
 | ||
Panel or saurface | 1, Aluminum + MDF panel |  |
2,Aluminum + Plywood panel |  | |
3, ABS + MDF panel |  | |
4,ABS + Plywood panel |  | |
5,Fireproof panel |  | |
Lock | 1,Clip lock without keys |  |
2,Usual metal lock with keys |  | |
3,Combination lock |  | |
4,Zinc alloy lock |  | |
5,Butterfly lock |  | |
Inner Lining | 1, EVA lining |  |
2, Nylon lining |  | |
3, Soft foam |  | |
4, Hard foam |  | |
5, EPE foam |  | |
Profile( frame) | Please check different pictures |  |
Handle | 1,Plastic handle |  |
2, Metal handle |  | |
3, Plastic + Metal handle |  |
1. We can design different case for you according to your equipment
We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us?+86 18118371888 Â ?ortell us your email address. We will reply to you as soon as we checked the email.
?
2. What's is sample cost and sample lead time?
-- Sample cost will depend on the case dimension and design requested, we could make case exactly based on your design and offer you the cheapest sample cost, also pls noted the sample cost is refundable after MOQ order confirmed.
Sample lead time shall be within 7-10days to finish, and we have to warm that the lead time maybe longer in busy season and in complicated case design etc.
?
3. Do you provide OEM/ODM service?
--Yes, OEM/ODM service is available.We could make case based on your design, pictures,product link provided.
We make sure the case will be same as the provided items and also,according to our experience,will keep contact with you for some necessary details amendments, as you know, little change will suit your market better for some products.
?
4. What is mass production time?
--Generally speaking, mass production time is 40days after order confirmed.
?
1. Reliability
We have many years experience. "abide strictly by good quality ,beyond customers "expectation" is our management policy, so supply the product with competitive price to many customers is our service Tenet
?
2.Fast delivery
As a big factory here, ?Except fast production time 5-10days, we have professional shipping department to support best shipping terms with best shipping price based on we have rich resources in shipping channels.
?
3. Low price
we are committed to providing the most affordable products for all our dear customers. We have our own factory and massive prouction line. This ensure that we can produce all materials at much lower price than our competitiors. We promise all products from the MFT are the most affordable in the industry, on base of the same quality degree.
Â
More and more fitness clubs choose artificial lawns when choosing ground materials. Artificial Turf has the advantage of not only the color is gorgeous, comfortable, can also relieve the damage of fitness equipment and the ground effectively, play a buffer role.
Low maintenance – generating savings on time and up-keep costs.
No watering – ideal where water is scarce or in hosepipe/sprinkler ban areas.
Better for the environment – no need for pesticides and mowing.
Durability with visual appeal – ideal for effective, low maintenance landscaping and play areas.
Ideal for areas of heavy usage – no more slippery, muddy areas.
All year round green – aesthetically pleasing to the eye no matter what time of year.
Gym Grass,Artificial Grass Gym,Grass Indoor Gym,Artificial Gym Grass Flooring
Neiqiu Huachi Rubber Plastic Technology Co., Ltd. , http://www.huachifloor.com