Suning, Hebei to fur nitrate-infected enterprises, "major surgery"

July 17, the author saw in the first Sunning County Sewage Treatment Plant, nine fur enterprises discharged industrial wastewater is a steady flow here, after the treatment of compliance discharged to the outside of the factory Xiaobaihe. According to reports, these nine companies are the first batch of Suning County installed COD online monitor, sewage flow meter fur nitrate enterprises. In the first half of this year, Suning County reduced COD by 231.47 tons and exceeded the task of 182.95 tons for the whole year; it reduced 66 tons of sulfur dioxide and greatly exceeded the annual emission reduction of 10 tons. Suning is the "Fur Capital of China" which enjoys a good reputation both at home and abroad. There are 52,000 employees involved in the project, and an average of 7 employees are involved in the fur industry. Formed a fur animal breeding, market distribution, the original leather tanning, fur processing, garment parts, export-oriented dragon-type industrial structure. In 2007, the output value of fur industry reached 5.3 billion yuan, taxes 42 million yuan. While promoting economic growth, the fur-related enterprises have become a serious source of pollution in the region. Last May last year, Suning County has 32 nitrate plant, of which only 9 went through environmental approval procedures. 21 did not apply for environmental approval procedures, unauthorized construction and illegal production. In the fur production season, the daily discharge of sewage due to nitrification can reach 8,000 tons. "Pollution control or not, related to the industry's life and death. 'China's fur capital' brand will never allow the pollution hit!" Suning official said. Since September last year, the battle of pollution control convention started and the pollution control and pollution control in the polluting industries became the primary task of the government at both the county and township levels. 32 related businesses are all shut down, rectification within a deadline, can not be discharged standards are not allowed to resume production. At the same time, the deployment of environmental protection, public security, electricity and other relevant personnel to conduct inspections, the implementation of 24-hour monitoring. As of now, 17 large-scale enterprises have all installed monitoring facilities, of which 9 have been tested and reached the standard to resume production. Eight of them are undergoing commissioning and 15 enterprises that have no hope of being shut down have been shut down. In order to realize the long-term treatment of enterprises with fur pollution, the county invested 36 million yuan in the Shangcun Town with a concentration of sewage enterprises to build the No. 1 Sewage Treatment Plant with a designed daily treatment capacity of 20,000 tons and an annual COD reduction capacity of 1,460 tons. January this year formally put into operation, the main deal with the town of industrial wastewater, domestic sewage, 1-6 months of this year COD176.27 tons. At present, the county invested 65.6 million yuan in the second sewage treatment plant site has been identified, the preparatory work is underway. After the completion of the WWTP, the daily processing capacity will reach 20,000 tons and the annual COD discharge will be 2,482 tons. In the fur industry emissions control pollution at the same time, the county also increase the focus on energy-consuming enterprises, the target responsibility management, the annual energy consumption in 3000 tons of standard Tianyu Transtech Services and other six key energy companies to implement the target responsibility management. Shut down two high-energy-consuming enterprises, 4 companies invested a total of 4.9 million yuan of energy-saving technological transformation, carried out 22 energy-saving process technology and equipment transformation.