[ Chinese wardrobe network ] Customized wardrobe installation seems to be a complicated process. Only after you understand the specific installation steps and methods, you will feel that the custom wardrobe installation is not as difficult as you think. Customized wardrobes need to be tailored to be able to Produce twice the result with half the effort.

First, the preparation stage

1, expected to arrive

More formal furniture manufacturers, cardboard packaging is generally shipped to the site. After unpacking, check the plates and hardware.

2, fixing screws

The nails are generally left on the plates according to the design drawings, and the workers at the site use special tools to fix the screws.

3, measuring the side panels

Since the closet is placed against the wall, the side panel is sawn off at the position of the baseboard. After you have it, look it up and see if it fits.

Second, the installation phase

1. Place the bottom plate

The floor placed on the bottom of the wardrobe should be cleaned beforehand, because it will be very troublesome to clean up after installation.

2, fixed frame

Install the side and back panels of the closet according to the grooves on the board and adjust the position between the boards.

3, install the top plate

It is best to prepare a climbing stool on the scene. The top plate should be lifted up and then fixed with rivets.

4, the installation shelf

Place the shelf where you have previously screwed it and then secure it. Pay attention to the fixed position of the shelf and the back and side panels.

5, fixed door rail

The door rails are installed on the top and bottom sides of the wardrobe. The material of the door rails is better, lighter and firmer.

6, install the clothes rail

Fix the rivets in the reserved position and install the clothes rail. Note that the two sides should be balanced.

Third, the closing stage

1, install the door leaf

The two sliding doors should be attached to the position of the guide rails. Fix the door leaf first and then fix the guide rails at the bottom side to avoid the phenomenon that the door leaf falls off in the future.

2, adjustment and improvement

After all the installations are completed, make a "full inspection" of the wardrobe. If there is any deviation, adjust it in time.

Fourth, the completion of acceptance

Finally, check the wardrobe: Shake the cabinet to see if it is firm and the details are in place.