The decoration should be in order
The reason why the decoration is complicated is that the engineering and work types involved are too numerous. The reason why the decoration is entangled is that it is impossible to coordinate so many contents and projects one by one. Especially when the decoration enters the second half, many projects extend from the communication with the decoration company to a series of links such as electrical appliances and furniture. The importance of coordination is more prominent. Although from a humanitarian point of view, the formal decoration company will set a timetable for the customer to tell what time to do, but from my experience, the foreman is unreliable, the project manager is also unreliable, the designer It is also impossible to soak in this construction site every day. Therefore, for the owners, it is often necessary to personally perform the deployment. Therefore, we should better understand the order of the progress of the project, so as not to make mistakes.
The last time the wall paint is tried again
The so-called process, at the beginning, thinks easily, but when the actual schedule is found, it turns out that there are many projects in the order of exquisite, only the reasonable effect before and after the best.
The most obvious example is the painting of wall paint. Generally speaking, the authentic decoration will be done after the basic treatment of the wall, brush the paint three times, the first two times the paint is okay, but the third time the paint, do not worry. For example, if the wall-mounted air conditioner hangs up after the last wall painting, even if the hole is drilled before, it will inevitably dirty the wall that has just been brushed, and according to the predecessors, it is "very dirty." The best way is to let the workers of the air-conditioner first come to punch holes in the wall, install the self-bow nails that hang the air conditioner, and then hang the air conditioner back after brushing the last paint. Of course, if the air conditioner manufacturer may not want to run two squats, the compromise is to let the manufacturer install between the second and third wall paint, so that the dirty part can be remedied when the last paint is brushed. But even so, the wall should be protected when the air conditioner is installed, otherwise it will be too dirty to clean up.
Similarly, the marble window sills made in the home are also installed early, for the reason that it is left in the end, it is likely to be dirty. Other projects may not pose any more threat to the wall, but after all, the light-colored walls are easily contaminated. Therefore, it is basically necessary to put some work that will cause dust or collision. That's right.
Must wait for the wall tiles to be re-decorated
Wall tiles and floor tiles are more important than painting. The important thing here is the kitchen. Generally speaking, many household cabinets are placed close to the wall. From this head to the end, it is better to get stuck in the card. Such a part of the tolerance for the error tolerance must be completely implemented after the surrounding environment is completely implemented.
Talk about my painful lesson: When the wall tiles of the kitchen were almost the same, please ask the cabinet designer, the measurement is completed, the designer gives a cabinet length of 3.25 meters. Because there were still two or three bricks on the side wall, there were no stickers, so the bricklayers were thousands of miles. I had to leave the kitchen with 3.25 meters. Whoever thought, after I finished the last few bricks, I went to the amount, which was 3.23 meters. ! If you pack the door again, it will inevitably shrink the length! Calling the cabinet designer, they are almost finished, they can't be changed. In desperation, only the cabinet manufacturers can stop first, and then wait until the door frame is finished. As for whether or not to pay the change fee... Who knows.
So, I have to ask you again, nails like this, nails are riveting work, be sure to wait until the surroundings are finished, don't make mistakes like me. Another point to note is that if you need to seal the balcony, try to seal it as early as possible, because it is impossible to lay the balcony on the floor and wall of the balcony, so it is best to start the work early, so as not to delay the paving progress.
Floors, etc., without ladders
Also laid on the ground, wooden floors can be more susceptible to damage than tiles. Although the formal decoration company should lay the film for the finished product protection, whether it is paving the floor or the floor, it is not allowed to be applied on the installed floor, but then, even with a layer of plastic film, some things with corners and corners fall. On the ground, it is still easy to grind out the prints—for example, ladders and racks on the ground, it is absolutely easy to bring damage to the floor.
Therefore, before installing the floor, it is necessary to put all kinds of ceiling lights on, put the wallpaper on, and put the curtain rod drying racks up. In short: if you don't need a ladder, you don't need to "work at height" and then lay the floor. Generally speaking, it is correct. At the same time, in order to avoid the damage of the wooden floor caused by the leakage of the disassembled heating, the installation of the radiator and the re-compression test should also be completed before this.
Also, if you are ready to order a walk-in closet door and a full wall shelf like my home, it is best to wait until the floor is laid and then measure, and don't be like someone saying "the ground is flat" size. The reason is very simple. The height of the furniture like a wall is not tolerable. Even if the thickness of the floor is known, but with the keel below, no one can guarantee that it is really "expected". not bad. Well, for the sake of stability, the construction period of these days will not be rushed.