Xenon lamp weather resistance test box inspection and maintenance
1. The wet ball gauze of the xenon lamp weather resistance test box should be replaced regularly: when the surface of the test cloth is not clean or hard, the test cloth must be replaced. The test cloth should be replaced every three months. The temperature measurement body should be scrubbed with a cleaning cloth when replacing. When replacing the new test cloth, the hands should be cleaned first.
Second, the inspection and adjustment of the wet bulb water level of the xenon lamp weather resistance test box
The level of the accumulator should not be too high to overflow the water, or the accumulator should be too low to make the wet ball test cloth absorb water abnormally, affecting the accuracy of the wet ball. The water level should be kept about six points full.
The water level of the water tube can be adjusted to adjust the height of the water box.
3. Inspection and maintenance of xenon lamp weather resistance test chamber.
project
situation
time
Test cotton replacement
Hardened and unclean
Before each test
Check water level (test cloth water level)
Periodic inspection
Every three months
Check the water level (water level in the tank)
Irregular inspection
Before each test
Clean power distribution room
Regular maintenance
Every six months
Clean the inner box
Before operation, regular maintenance
Anytime, every three months
Clean the body
Regular maintenance
Every six months
"Puzzle 3D Eraser Bulk,Puzzle 3D Eraser,Building Blocks Eraser,Toppers Cute Erasers "
Yiwu Shengshang Stationery Co., Ltd. , https://www.ss-stationery.com